RefferencesProjects

  • Replacing the generator stator unit No. A3
    Zespół Elektrowni "Nikola Tesla" doo Obrenovac 2014
    Download PDF
  • Replacing of the generator stator for unit nr 7
    TE Kakanj 2014
    Download PDF
  • Replacing of the steam piping on the boiler no. 6
    GDF Suez Energia Polska S.A. 2014
    Download PDF
  • Revitalization of the turbine shut-off valve TC-30 Tz-2 at Siekierki Power Plant
    Przedsiębiorstwo Naukowo - Techniczne "Pro Novum" Sp. z o.o. 2014
    Download PDF
  • Revitalization of control valves chambers SP
    Przedsiębiorstwo Usług Naukowo - Technicznych "Pro Novum" Sp. z o.o. 2014
    Download PDF
  • Repair of turbine set and units’ auxiliary equipment
    Elektrociepłownia Chorzów "Elcho" Spółka z o.o. 2014
    Download PDF
  • Overhaul of boilers and mills
    Veolia Energia Łódź S.A. 2014
  • General overhaul and modernization of the 13K225 turbine with auxiliary equipment for unit no.3 . Fittings
    TAURON Wytwarzanie S.A. 2014
  • Overhaul of the units 1 & 2
    TAURON Wytwarzanie S.A. 2013
    Download PDF
  • Overhaul of the fittings and piping in the machinery room on the unit no. 4
    TAURON Wytwarzanie S.A. 2014
    Download PDF
  • Repair of 2 cranes Q – 100 201 no. 4 & 28
    Elektrownia Skawina S.A. 2013
  • Prefabrication of water pipelines for boiler BB-1880
    RAFAKO S.A. 2012
  • Renovation of the electrostatic precipitator for boiler No. 7
    Bilfinger ELWO S.A. 2014
  • Modernization and supply of rotary air heaters for unit No. 3
    TAURON Wytwarzanie S.A. 2014
  • Renovation of the electrostatic precipitator for boiler no. 5
    ALSTOM Power Sp. z o.o. 2014
  • Modernization of the rotor part of the NP. 13UK125 – turbine unit TG-2.1
    EDF Polska S.A. 2014
  • Modernization of the coal handling system
    Elektrociepłownia Będzin S.A. 2006 - 2008
  • Mechanical installation and I&C works on the reduction cooling stations 6RS2
    TAURON Wytwarzanie S.A. 2013
  • Designing, supply, instalation and commissioning of coal handling system in CHP Częstochowa
    Fortum Power and Heat Polska Sp. z o.o. 2008 - 2010
  • High-speed dynamic balancing of HP rotor
    Power Plant Stalowa Wola 2010
  • Replacing the pipes connecting the boiler with turbine and suspensions ,modernization of secondary steam pipe fixtures on the boiler No.2 (EP 650-137) for GDF Suez Energy Poland SA in Połaniec
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2013
  • Replacing the evaporator tubes in the area of the hot hopper and replacing parts of the main secondary steam pipe along with support for the safety valve
    Power Plant Rybnik S.A. 2012
  • Replacing the evaporator tubes in the area of the hot hopper and replacing parts of the main secondary steam pipe along with support for the safety valve
    Power Plant Rybnik S.A. 2012
  • Replacement of boiler flash tanks of K2 and K3 boilers in EC-4 Łódź
    Dalkia Łódź 2014
  • Replacing the steam preheater SH2
    Power Plant „Siersza” 2010
  • Replacing of steam preheater third-degree OP 140 No. 6
    Power Plant Będzin 2011
  • Manufacturing of a 40 MG engine bearer
    Man Diesel & Turbo SE 2010
  • Induction pipe bending
    Rafako S.A. 2011 - 2012
  • Manufacturing of a stator core’s bed
    Turbo Care Poland S.A. 2010
  • Manufacturing of a lifting sling 022
    Man Diesel & Turbo SE Niemcy 2010
  • Anti-corrosion coating
    GRACO Sp.z o.o. 2010
  • Pipe bending
    Stalbud Tarnów Sp. z o.o 2012
  • Manufacturing of a clutch’s sleeve for TK120 HP
    Elektrownia Stalowa Wola 2010
  • Manufacturing of a silos
    AET a/s Dania 2010
  • Manufacturing of grinders
    Man Diesel & Turbo SE 2010
  • General retrofits of K-4 & 8 boilers
    EDF Rybnik S.A 2012
  • Manufacturing of a trolley chassis
    Jarem Sp.z o.o. 2010
  • Manufacturing of grinders
    Man Diesel & Turbo SE 2010
  • Manufacturing of damper plate
    Man Diesel & Turbo SE 2010
  • Mechanical working of grinder chamber
    FPM S.A. 2010
  • Mechanical working
    Fermstal WKS Sp. z o.o. 2010
  • Manufacturing of A6 outcoming steam turbine casing
    Man Diesel & Turbo SE 2010
  • Manufacturing of A1 outcoming steam turbine casing
    Man Diesel & Turbo SE 2010
  • Manufacturing of welded casing A2 & A2′
    Man Diesel & Turbo SE 2010
  • Manufacturing of III casing
    Siemens AG Niemcy 2010
  • Manufacturing of A3 casing
    Man Diesel & Turbo SE Niemcy 2010
  • Equipotentialization of the interior space construction of the biomas fuel mixture transport
    Fortum Zabrze S.A. 2012
  • Grinders manufacturing
    Man Diesel & Turbo SE 2010
  • Manufacturing of 023 grinder
    Man Diesel & Turbo SE 2010
  • Manufacturing of grinder 5000
    Man Diesel & Turbo SE 2010
  • Disassembly and assembly of new INTREX steam superheater
    PKE Elektrownia Jaworzno III 2011
  • Manufacturing of A8 outcoming steam turbine casing
    Man Diesel & Turbo SE 2010
  • Verification of the calculation model AutoPIPE of steam pipeline in Jaworzno II,TG1
    Tauron Elektrociepłownia Bielsko Biała 2012
  • Verification of the model of steam AutoPIPE
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2012
  • Feedwater piping prefabrication – unit 8410 and construction elements delivery – unit 1214 for a BB 1880 boiler – Block B1 Tent B Obrenovac, Serbia
    Rafako S.A. 2012
  • Leaks removal on the high pressure exchangers PWS of the pipe system , block no 2,overhaul of the diaphgram clamp and the cooler strainer and the exchange of the live steam pipeline elbow
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno II 2013
  • Enhancing of turboset Tz1 type 13UC105 in EC-4 Łódź
    Dalkia Łódż 2014
  • Enhancing of turboset Tz2 type 13CK60 in EC-4 Łódź
    Dalkia Łódż 2014
  • Enancing of turboset Tz1 type13UP55 in EC-4 Łódź
    Dalkia Łódż 2014
  • Enhancing of OP-430 boiler no. K7 in EC-4 Łódź
    Dalkia Łódź 2014
  • Enhancing of OP-230 boiler no. K2 in EC-4 Łódź
    Dalkia Łódź 2014
  • Enhancing of BFB180 boiler no. K3 in EC-4 Łódź
    Dalkia Łódź 2014
  • Water system administrator for hausing of the motor pump
    Tauron Wytwarzanie S.A. Elektrownia Łagisza 2013
  • Workshop overhaul with delivery of parts for 222 MW turboset no. 1 type 13K215
    PGE G i EK S.A. Odział Zespół Elektrowni Dolna Odra 2015
  • Workshop overhaul with delivery of parts for 222 MW turboset no.1 type 13K215
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2014
  • Modernization of turbine 13UK125 LP part rotor of power unit TG-2/1
    EDF Elektrociepłownia Kraków 2014
  • Medium overhauls of the turboset no.1 & no 2,type SIEMIENS EHNK 90/5,0 110 MW including auxiliaries
    Elektrociepłownia "ELCHO" Chorzów S.A. 2013
  • Overhaul of the cut-off and control valves WP of the TG3 AND TG6 turbosets
    Elektrownia Rybnik S.A. 2013
  • Turboset modernization EK 48/8/14,5(TG2) installed in Z-2 “Knorow” w Knurowie
    Megawat Sp. z o.o. 2013
  • Medium overhaul of the turboset Tz-4 in heat and power station in Żerań
    PGNiG Termika 2013
  • Running overhaul of the turboset TZ-12 ,Siemens, in Heat and Power Station in Żerań
    PGNiG Termika 2013
  • Medium overhaul of the turboset Tz-11 , Siemens, in heat and power station in Żerań
    PGNiG Termika 2013
  • Medium overhaul of the turbogenerator no1 including the auxiliaries
    Tauron Wytwarzanie Elektrownia Blachownia 2013
  • General overhaul of the feed water pumps HDG-55
    Tauron Wytwarzanie Elektrownia Blachownia 2013
  • General modernization and overhaul of the 13k225 turbine including auxiliaries on the block no6. Modernization of the gas and vapour suction installation
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2013
  • General overhaul of the 13k225”turbine on the block no 6
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2013
  • Tranformers transport
    PSE-Południe S.A. 2012
  • Transport of non-standard and standard goods
    Bombardier 2012
  • Road transport of two hydraulic presses of waighted 86 tons each
    CERRAD Sp. z o.o. 2011
  • Specialistic transport of railroad materials
    ThyssenKrupp GfT Polska Sp. z o.o. 2008 - 2009
  • Transport of non-standard and standard goods
    Fabryka Palenisk Mechanicznych S.A. 2001 - 2009
  • OVerhaul&modernization works at electrostatic precipitator of boiler no.5
    Energa Kogeneracja Sp. z o.o 2014
  • Modernization of the boiler no 3 for NOx emission reduction
    Elektrownia Kozienice S.A 2012
  • Modernization works of the burner system on boiler no 6
    Elektronia Rybnik S.A. 2009
  • Modernization of the coal burners on block no 8
    Elektronia Rybnik S.A. 2009
  • Installation of the biomass feeding systems for the boilers no 1, 2, ,3
    Elektronia Rybnik S.A. 2009
  • Overhaul of WSz-2 heat exchanger in EC-Łódź
    Dalkia Łódź 2014
  • Repair of parts of power unit no.2
    Elektronia Rybnik S.A. 2014
  • Works during revitalization of quick-closing valve of TC-30 Tz-2 turbine in Sierkierki CHP
    PGNiG Termika 2014
  • Modernization of turboset no.5 PGE G i EK S.A. Odział Zespół Elektrowni Dolna Odra 2013
  • Revitalization of quick-closing valve AZO of TC-30 Tz-3 turbine in Siekierki CHP
    PGNiG Termika 2013
  • General overhaul of turboset no.7
    Tauron Wytwarzanie S.A. Elektrownia Łagisza 2013
  • General overhaul of turbo generator of power unit no.5
    Termoelektrana Tuzla 2013
  • Modernization and general overhaul of TK225 turboset of power block 11
    Tauron Wytwarzanie S.A. Elektrownia Łaziska 2012
  • Erection of two stoker boilers type OSr-57
    Rafako 2014
  • Erection of two stoker boilers type OSr-57
    Fortum Zabrze S.A. 2014
  • Overhaul of fittings and pipings in the machine room area on power block no. 4 during medium overhaul
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2014
  • Emergency removal of leakage of XW1 exchanger type PWS 600/520 on power block no.1
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2014
  • Medium overhaul of power block no 4 boiler in the scope of fittings and safety valves
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2014
  • General overhaul and modernization of turbine 13K225 with auxiliary eqiupment on power block no. 3
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2014
  • Delivery and erection og the external pipeline – Helius CoRDe
    Aalborg Energie Technik a/s 2013
  • Medium overhaul of the turboset no 1 and 2 ,type Siemens EHNK 90/5,0 ,110 MW, including auxiliaries
    Elektrociepłownia "ELCHO" Chorzów S.A 2013
  • Internal revision of the UDT third part of the collector in power and heat station Żerań
    PGNiG Termik 2013
  • Works and supply connected with the development system of special instruments Bently-Nevada on the 300MW block
    Elektrownia KKAB w Karlshamn 2013
  • Modernization of the turboset EK 48/8/14,5(TG 2)installed in the Z2 Knurow w Knurowie
    Megawat Sp. z o.o. 2013
  • Mechanical erection works and AKPiA on the cooling and reduction station 6RS2 on the block no 2
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno II 2013
  • Mechanical erection works and AKPiA on the cooling and reduction station 6RS2 on the block no 6
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno II 2013
  • Overhaul-assembly works of overhead travelling cranes Q=35T, winch Q=180 t
    Windex Holding Sp. z o.o. 2014
  • Overhaul-assembly works of overhead travelling cranes Q=35T, winch Q=180 t
    CEZ Elektrownia Skawina 2013
  • Repair of the crane winch frame SB-2
    Zespół Elektrociepłowni Wrocławskich Kogeneracja S.A. 2010
  • Modernization of rotary air heaters on block No. 2
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2011
  • Restoration of the pipeline loop with the main steam gate valve on Jaworzno II, TG-1
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2012
  • Design and installation of heat exchangers and the generator on the block BC50
    Tauron Elektrociepłownia Bielsko Biała 2011 - 2012
  • Design and installation of heat exchangers and the generator on the block BC50
    Tauron Wytwarzanie S.A. Elektrownia Łagisza 2011 - 2012
  • Modernization of the 3 MPa collector of steam system on blocks 120MW
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2013
  • Coordination of modernization and repair of boiler and auxiliary equipmentKoordynacja modernizacji i remontu kotła i urządzeń pomocniczych
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2013
  • Development of the concession documentation and assembly workshop
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2013
  • Modernization of turbine set TG 1 (with turbine 10CK60) in Jaworzno III Power Plant – Power Plant II
    GDF Suez 2012 - 2013
  • Coordination of modernization and repair of boiler and auxiliary equipment on unit No. 3
    Elektrownia Opole 2014
  • Disassembling and erection works on the part of 13k225 WP turbine on the block no 11
    Tauron Wytwarzanie S.A. Elektrownia Łaziska 2013
  • General overhaul of the turbogenerator on the block no 5
    Termoelektrana Tuzla 2013
  • Medium retro fit of the turboset no 1 and general retrofit of the turbo set no 2 including auxiliaries
    CEZ Elektrociepłownia Chorzów "ELCHO" Sp. z o.o 2012
  • Retrofit of the TC-32 turboset
    Spółka Energetyczna "Jastrzębie" S.A. 2012
  • Medium retrofit of the turbogenerator no 2 including auxiliaries
    Tauron Wytwarzanie Elektrownia Blachownia 2012
  • Modernization and general overhaul of the TK225 turboset – block no 11
    Tauron Wytwarzanie S.A. Elektrownia Łaziska 2012
  • Medium retro fit of the TG-10 turboset
    Tauron Wytwarzanie S.A. Elektrownia Łaziska 2012
  • Modernization and general retrofit of the 13K225 turboset on block no 4 including auxiliaries
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno III 2012
  • Preparation for diagnostic tests and carrying out revision of UDr of boiler K63
    Fortum Zabrze S.A. 2014
  • Erection of two stoker boilers type OSr-57
    Bilingham, Wielka Brytania 2013
  • Kronopla’s overhaul
    Aalborg Energie Technik a/s 2013
  • Erection of the preassure part –Helius CoRDe
    Aalborg Energie Technik a/s 2013
  • Erection of the mechanical packet –Helius Co RDe
    Aalborg Energie Technik a/s 2013
  • Brickwork of CFB boilers
    Elektrociepłownia "ELCHO" Chorzów S.A. 2013
  • Diagnostics and overhaul of steam boiler OP-130 no. 3
    Fortum Bytom S.A. 2013
  • Overhaul of the fittings and pipeline around the turbine room during routine repair on the blok no2
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno II 2013
  • Overhaul of the fittings, erection and disasembly of the Pletewac scaffold in the boiler no 1
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno II 2013
  • General overhaul of the boiler fittings no 6
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno II 2013
  • Overhaul of the fittings and pipeline around the machinery room during routine repair on the blok no1
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno II 2013
  • General overhaul of the fittings and pipieline oround the turbine room during general overhaul of the 13k225 turbine on the block no 6
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno II 2013
  • Overhaul of the fittings, erection and disasembly of the Plewetac scaffold in the boiler no 5
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno II 2013
  • Emergency current repairs of mechanical parts of block devices 1-6
    Tauron Wytwarzanie S.A. Elektrownia Jaworzno II 2013
  • The CFB 1300 heat source modernization concept
    TAURON WYTWARZANIE - 2015
  • Installation of a 50 MW CFB boiler – Tullis Russell Markinch (Scotland)
    VALMET POWER OY - 2013
  • Revitalization and modernization of the 6 – 215 MW boiler block
    Termoelektrana TE Tuzla - 2013
  • Modernization with the supply of rotary air heaters on block No. 4,6,3,1 and 5
    TAURON WYTWARZANIE - 2015
  • Adaptation of OP-650 K boilers No. 9,10,11,12 to reduce NOx emissions
    TAURON WYTWARZANIE - 2015
  • Modernization of boiler No. 1 and 2
    ENEA WYTWARZANIE SP Z O.O. - 2015
  • Renovation of a K8 type OP-650 boiler
    EDF - 2014
  • Modernization of the OP-650B steam boiler No. 1 and 2 at the Pątnów 1 Power Plant
    SBB ENERG - 2015
  • assembly of two OSr-57 grate boilers
    RAFAKO - 2015
  • Renovation works of the K-10 boiler of the 460 MW unit together with auxiliary equipment CFB 1400
    TAURON WYTWARZANIE - 2014
  • Capital overhaul of the pressure system of the OFz-450B fluidized bed boiler with the replacement of the superheater of the second stage steam (bulkhead) in Elektrociepłownia Żerań
    PGNiG TERMIKA - 2014
  • Modernization of the OP-650k boiler unit No. 12
    TAURON WYTWARZANIE - 2012
  • Replacing the boiler catalyst modules and repairing the economizer of the boiler No. 12
    STRABAG AG - 2016
  • Modernization of the OP-430 boiler no. 10 in the Siekierki Heat and Power Plant
    PGNiG Termika - 2017
  • Improvement of boilers in EC-3 -EC-4 Veolia Łódż.
    VEOLIA ENERGIA - 2017
  • Mechanical installation of a biomass boiler in Kent, Great Britain
    BURMEISTER & WAIN SCANDINAVIAN CONTRACTOR - 2018
  • F1101 at Lyondell Basell – Berre I’Etang, France
    CMI SA - 2018
  • Repair of the air preheater (bottom section) and replacement of the water heater (1st stage) in the OP-210M – K-10 boiler
    CEZ POLSKA - 2018
  • Revitalization of the WP valve
    TERMOELEKTRANE NIKOLA TESLA - 2017
  • Modernization and overhaul of the TK225 turbine set block No. 10
    TAURON WYTWARZANIE - 2013
  • Replacing the stator generator of unit A3 with the use of specialized construction without the use of a crane, by means of hydraulic systems for horizontal and vertical transport
    Termoelektrana Nikola Tesla - 2014
  • Complete overhaul of fittings and pipelines of the TG-1 turbine set at PGE Energia Ciepła SA in Kraków
    PGE ENERGIA CIEPŁA - 2018
  • Modernization of pipelines and fittings on the circulating water system at Ec Siekierki
    PGNiG TERMIKA - 2017
  • Prefabrication and delivery of high pressure pipelines (LAB, LBB, LBC, LBA) together with auxiliary systems and supervision over assembly, as part of the construction of a new power unit with 910 MW capacity for supercritical parameters for Tauron Wytwarzanie. Jaworzno III Power Plant – II Power Plant in Jaworzno
    RAFAKO - 2017
  • Current and emergency repairs of fittings on boilers and turbines of blocks 1 – 6
    TAURON WYTWARZANIE - 2016
  • Delivery, prefabrication, assembly of complete piping installations
    BUDIMEX S.A. - 2016
  • Complete overhaul of pipelines and fittings within the engine room of block 1 and block 5
    TAURON WYTWARZANIE - 2015
  • Prefabrication and delivery of shaped elements of the fresh steam pipeline for blocks no. 3,4,5
    GDF SUEZ ENERGIA POLSKA - 2015
  • Replacement of fresh steam piping connecting boiler with turbine with suspensions and modernization of secondary steam piping fastening on boiler No. 2 (EP 650-137) for GDF Suez Energia Polska S.A. in Połaniec
    GDF SUEZ ENERGIA POLSKA - 2014
  • nstallation of measuring equipment for a biomass-fired fluid boiler, so-called “Green Block”
    ENEA POŁANIEC S.A. - 2013
  • POLICE OP230 – Responsibilities of the Project Manager, Project Engineer and specialist investor’s supervision
    Grupa Azoty Zakłady Chemiczne Police S.A. - 2018
  • Replacement of fresh steam piping connecting boiler with turbine with suspensions and modernization of secondary steam piping fastening on boiler No. 2 (EP 650-137) for GDF Suez Energia Polska S.A. in Połaniec
    GDF SUEZ ENERGIA POLSKA - 2013
  • Assembly and welding works on modernization of pumping stations and technological pipelines
    EURO-SPAW KASPRZYCKA JOLANTA - 2013
  • Overhaul of tank pumping stations
    EURO-SPAW KASPRZYCKA JOLANTA - 2014
    Download PDF
  • Welding and assembly works in the course of the task consisting in the extension of the installation for dosing company fuel additives in the Fuel Depot No 5 in Emilianów
    EURO-SPAW KASPRZYCKI WIESŁAW - 2015
    Download PDF
  • Renovation of storage tanks at the Lotos Asfalt PZG installation in Gdańsk
    LOTOS ASFALT SP.Z O.O. - 2019
    Download PDF
  • Essential and auxiliary work of the mechanical industry from 2017 – 2018
    LOTOS SERWIS SP. Z O.O. - 2018
    Download PDF
  • Overhaul works in the mechanical industry, carried out during the renovation stopover “SPRING 2017” repair standstill on installations of Grupa LOTOS S. A. in Gdańsk.
    LOTOS PALIWA SPÓŁKA Z O.O. - 2018
    Download PDF
  • Overhaul works in the mechanical industry, carried out during the renovation stopover “SPRING 2018” repair standstill on installations of Grupa LOTOS S. A. in Gdańsk.
    LOTOS PALIWA SPÓŁKA Z O.O. - 2018
    Download PDF
  • Adaptation of tanks No. 23 and 24 with a capacity of V=32,000 m3 for receiving and dispensing petrol
    EURO-SPAW KASPRZYCKA JOLANTA - 2014
    Download PDF
  • Modernization of high-pressure regeneration, low-pressure regeneration and feedwater tank of the unit no. 1 and unit no. 5
    TAURON Wytwarzanie S.A. - 2015
  • Assembly of steam turbine condensator Genreal Electric A17
    SNC-Lavalin Polska Sp. z o.o. - 2015
  • Major overhaul of turboset 13K215 type TG-4 and TG-6
    EDF Polska S.A. Oddział Rybnik - 2016
  • Heat exchanger modernization
    CEZ Chorzów S.A. - 2016
  • Mean repair of turbogenerators no. 1 and no. 2 with auxiliaries
    CEZ Chorzów S.A. - 2016
  • Major overhaul of unit BCF-100 – fluidized-bed boiler CFB 134,2
    TAURON Ciepło Sp. z o.o. - 2016
  • Major overhaul of unit BCF-100 – turboset KT120/13
    TAURON Ciepło Sp. z o.o. - 2016
  • Overhaul of proper boiler CFB 260 unit no. 2
    TAURON Wytwarzanie S.A. - 2016
  • Major overhaul of turbogenerator no. 1 with auxiliaries
    Tameh Polska Sp. z o.o. - 2016
  • Manufacturing and replacement of coils on boiler no. 5 in Naphtachimie – Lavera, France
    CMI SA - 2016
  • Placement of the TG-4 generator stator (mass 120 t) in CHP Kraków
    EthosEnergy Poland S.A. - 2017
  • Restoration of TZ1 turboset in CHP Białystok
    ENEA Wytwarzanie Sp. z o.o. - 2017
  • Modernization of boilers no. 3 and no. 8
    ENEA Wytwarzanie Sp. z o.o. - 2017
  • Mean repair of turbogenerators no. 1 and no. 2 with auxiliaries
    CEZ Chorzów S.A. - 2017
  • Major overhaul of turboset condenser no. 1
    ENERGA Serwis Sp. z o.o. - 2017
  • Installation of a steam-gas turboset in Włocławek
    SNC-Lavalin Polska Sp. z o.o. - 2017
  • Preassembly and final installation of boiler pressure part and Main Steam Line at Cramlington CHP Biomass Plant
    Burmeister & Wain Scandinavian Contractor A/S 2016 - 2018
  • Overhaul of high-pressure part WP and generator of turbogenerator no. 2 with auxiliaries
    TAMEH POLSKA Sp. z o.o. - 2018
  • Manufacturing and replacement heat exchangers
    Grupa Azoty - 2018
  • Modernization electrofilter of unit no. 6 at ENEA Wytwarzanie Sp. z o.o.
    WALLSTEIN ROTHEMÜHLE Sp. z o.o. - 2018
  • Renovation of water management equipment at CHP Pruszkow
    PGNiG Termika S.A. - 2018
  • UDT revision of WC1 and WC4 heat exchangers at CHP Pruszkow
    PGNiG Termika S.A. - 2018
  • Partial replacement of pipes of heat exchanger Psz-1000 type
    PGNiG Termika S.A. - 2018
  • Mechanical erection of new fluidized-bed boiler in CHP Zabrze
    SUMITOMO SHI FW ENERGIA POLSKA SP. Z O.O. - 2018
  • Erection of boiler pressure parts and external piping to Edinburgh’s Energy-from-Waste Plant, United Kingdom
    Hitachi Zosen Inova AG - 2018
  • Assembling of SNCR installation on boilers K1 and K2 at power plant in Kraków
    Fortum Power and Heat Polska Sp. z o.o. - 2019
  • Repair of turbosets no. 1 and no. 2
    CEZ Chorzów S.A. 2018 - 1019
  • Replacement of pressure part K-6 and K-8 boilers in combined heat and power plant in Białystok
    ENEA Ciepło S. z o.o. - 2019
  • Modernization electrofilter of unit no. 7 at ENEA Wytwarzanie Sp. z o.o.
    WALLSTEIN ROTHEMÜHLE Sp. z o.o. - 2019
  • Major overhaul of turboset no. 1 with auxiliaries
    TAMEH POLSKA Sp. z o.o. - 2019
  • Manufacturing and replacement of coils on boiler no. 3 in Naphtachimie – Lavera, France
    CMI SA
  • BFB boiler assembly Ørsted Bioenergy & Thermal Power A/S., Kalundborg, Denmark
    Valmet Technologies OY - 2019
  • Repair in the scope of UDT activities and fittings at CEZ Chorzów S.A. in 2020, 2021 and 2022
    CEZ Chorzów S.A. - 2020, 2021, 2022
  • Mean repair of turbines in 2020, 2021 and 2022
    CEZ Chorzów S.A. - 2020, 2021, 2022
  • Major overhaul of turboset no. 2 at PGE Energia Ciepła S.A. Oddział nr 1 w Krakowie
    PGE Energia Ciepła S.A. - 2020
  • Modernization of turboset Tz-8 at CHP Siekierki in Warsaw
    PGNIG Termika S.A. - 2020
  • Construction of Tworog node, located on DN1000 gas pipeline in mechanical, technological, installation and construction branch with earthworks, roads and land development and commissioning
    IDS-BUD S.A. - 2020
  • Modernization of boiler no. 5
    ENEA Wytwarzanie Sp. z o.o. - 2020
  • Modernization of boilers no. 7, 2, 1 – in 2018, 2019 and 2020
    ENEA Wytwarzanie Sp. z o.o. - 2018, 2019, 2020
  • Repair of GAVO at Łaziska Power Plant
    TAURON Wytwarzanie S.A. - 2020
  • Erecion of system scaffoldings in combustion chamber of boiler no. 3 and no. 4
    TAURON Wytwarzanie S.A. - 2020
  • Delivery, prefabrication and assembly of complete piping installations fot WTE turbine and BIO turbine during project “Construction of new power plant in Wilno – Lithuania”
    BUDIMEX S.A. - 2020
  • Diagnostic tests of live and superheated steam pipelines of power units working in creep conditions
    PGE Górnictwo i Energetyka Konwencjonalna S.A. - 2021
  • Services in E&IC branch for Fortum Zabrze
    Fortum Silesia S.A. - 2021
  • Repair works of RDF and ash removal system in CHP Zabrze
    Fortum Silesia S.A. - 2021
  • Mechanical erection during Hooton Bio Power Project, Liverpool, United Kingdom
    Burmeister & Wain Scandinavian Contractor A/S - 2021
  • Replacement and modernization of rear wall of combustion chamber of the boiler no 3. in TAURON Wytwarzanie S.A. – Elektrownia Jaworzno III w Jaworznie – Elektrownia II
    TAURON Wytwarzanie S.A. - 2021
  • Erection and disasembly of scaffoldings, thermal insulation and brickworks on unit no. 6
    TAURON Wytwarzanie S.A. - 2021
  • Overhaul of steam turbine 13UCK80 type
    Elektrociepłownia Będzin Sp. z o.o. - 2021
  • Overhaul of the pressure system of boilers no. 1 and no. 2
    TAURON Wytwarzanie S.A. - 2022
  • Manufacturing of evaporator
    John Cockerill - 2023